Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Hydraulic pile driver working principle and engineering application scope High frequency hydraulic vibratory pile driver is using vibrating pile sinking to drive or extract piles. It is especially suitable for municipal, bridges,cofferdam, building foundation etc. such short pile projects. Pile Driver Application The efficient of vibration pile method is higher than other methods. It is mainly are fit for driving and extracting sheet piles, I-steel piles, Cement square pile,cylinder pile, larsen piles in various shapes. This pile driving method is the most suitable for working in sand and poorer effect in the clay which must select higher power model machines. |
1. Perfectly engineered for approximately 20-ton excavators.
2. Outfitted with a top-tier Parker motor and premium brand bearing.
3. Delivers unwavering and formidable vibrations up to 360KN, achieving a piling speed of 7.5m/min.
4. Boasts a robust and enduring main clamp, meticulously crafted through casting.
The S350 masterfully balances size, flexibility, and efficiency, making it an exceptional choice for a variety of construction projects.
Model | Unit | S350 | S500 | S600 | S650 | S800 |
Vibration Frequency | Rpm | 3000 | 2800 | 2800 | 2700 | 2400 |
Eccentricity Moment Torque | N.M | 36 | 52 | 70 | 83.5 | 126 |
Rated excitation force | KN | 360 | 450 | 600 | 650 | 800 |
Hydraulic system pressure | Mpa | 32 | 32 | 32 | 32 | 32 |
Hydraulic system flow rating | Lpm | 250 | 240 | 315 | 310 | 310 |
Maximum pile length (m) | m | 6-9 | 6-15 | 6-18 | 6-18 | 6-22 |
The auxiliary arm weight | Kg | 800 | 800 | 900 | 900 | 1000 |
Total Weight | Kg | 1750 | 2750 | 3200 | 3200 | 3600 |
Suitable Excavator | ton | 18-25 | 27-37 | 36-50 | 42-50 | 50-70 |
To ensure the utmost safety of your goods, we offer professional, eco-friendly, and highly efficient packaging services.
Packaging details: Secure export wooden box packaging or customized as per customer requirements.
Delivery Details: Estimated shipping duration is approximately 20 to 30 working days post-payment.
We rigorously test each product before delivery to guarantee that every machine meets our high standards of quality. Once verified, the goods are loaded onto container trucks and transported to the port.
Our versatile product is compatible with excavators of various brands, and we maintain enduring and stable partnerships with renowned industry leaders.
Pile Hammer How to Work?
The vibrating pile hammer employs high-frequency vibrations to energize the pile body with substantial acceleration, transmitting vertical vibrations to the pile. This process results in alterations to the soil structure around the pile, reducing its strength and causing liquefaction. This reduction in frictional resistance between the pile and the surrounding soil allows for easier penetration. Utilizing the excavator's downward force, along with the combined weight of the vibrating pile hammer and the pile itself, the pile is driven into the soil. During extraction, vibratory force is applied while the pile is lifted by the excavator, effectively removing it from the ground. The required excitation force is determined by various factors including site soil, soil condition, moisture content, and type of pile and construction.
1. Q:How to chose the suitable model?
A: Please kindly advise your excavator weight or model, then we will help you to decide the suitable model.
2. Q: Is your vibro driver dangerous for work?
A: Our machine operate contact-free and there is no impact force on the drill rod, so our machine is not dangerous for work.
3. Q:Is your size can be custome made?
A:Yes, we can custom made according to your requests.
4. Q:Do you offer after-sale service?
A: Yes, we will offer you machine operation instructions. 6 months of warranty time for the motor will be offered to our customer dating from the receipt day. Besides, we will offer life long technical instruction.
5.Q:How To Order:
1. Please tell us the model with quantity and other requirement which you needed.
2. We issue the Proforma Invoice to you after confirmed the price and other details.
3. We arrange the order production upon receipt of confirmed PI and your deposit or original L/C.
4. After the goods is ready to ship, we will inform you the shipment date and other informations by email at the same time.
5. We will help to track your goods until you receive them safely.