Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 6 Mounth |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Hydraulic pile driver working principle and engineering application scope High frequency hydraulic vibratory pile driver is using vibrating pile sinking to drive or extract piles. It is especially suitable for municipal, bridges,cofferdam, building foundation etc. such short pile projects. Pile Driver Application The efficient of vibration pile method is higher than other methods. It is mainly are fit for driving and extracting sheet piles, I-steel piles, Cement square pile,cylinder pile, larsen piles in various shapes. This pile driving method is the most suitable for working in sand and poorer effect in the clay which must select higher power model machines. |
Model | Unit | S350 |
Vibration Frequency | Rpm | 3000 |
Eccentricity Moment Torque | N.M | 36 |
Rated excitation force | KN | 360 |
Hydraulic system pressure | Mpa | 32 |
Hydraulic system flow rating | Lpm | 250 |
Maximum pile length (m) | m | 6-9 |
The auxiliary arm weight | Kg | 800 |
Total Weight | Kg | 1750 |
Suitable Excavator | ton | 18-25 |
To ensure the utmost safety of your valuable goods, we offer professional, environmentally friendly, and highly efficient packaging services, guaranteeing convenience and protection.
Packaging details: Standard Export wooden box packaging or customized as per your specific requirements.
Delivery Details: Expect shipping to occur within approximately 20-30 working days following payment.
Every product undergoes rigorous testing before dispatch, affirming its qualification. This commitment to quality is our pledge to you. Post-testing, goods are loaded onto container trucks for secure transport to the port.
Our versatile product suits excavators from various reputable brands, supported by our long-standing and stable partnerships with renowned industry leaders.
Pile Hammer How to Work?
The vibrating pile hammer employs high frequency vibrations to impact the pile body with intense acceleration, transmitting vertical mechanical vibrations to the pile. This process alters the surrounding soil structure, reducing its strength. The soil liquefies around the piles, diminishing the frictional resistance between the pile's sides and the soil. Utilizing the excavator's downward force, the vibrating hammer, and the pile's own weight, the pile is efficiently driven into the soil. For extraction, vibrations assist the excavator's lifting force to retract the pile. The excitation force required by the pile driving machinery is determined by factors such as site soil, condition, moisture, pile type, and specific construction requirements.
1. Q:How to chose the suitable model?
A: Please kindly advise your excavator weight or model, then we will help you to decide the suitable model.
2. Q: Is your vibro driver dangerous for work?
A: Our machine operate contact-free and there is no impact force on the drill rod, so our machine is not dangerous for work.
3. Q:Is your size can be custome made?
A:Yes, we can custom made according to your requests.
4. Q:Do you offer after-sale service?
A: Yes, we will offer you machine operation instructions. 6 months of warranty time for the motor will be offered to our customer dating from the receipt day. Besides, we will offer life long technical instruction.
5.Q:How To Order:
1. Please tell us the model with quantity and other requirement which you needed.
2. We issue the Proforma Invoice to you after confirmed the price and other details.
3. We arrange the order production upon receipt of confirmed PI and your deposit or original L/C.
4. After the goods is ready to ship, we will inform you the shipment date and other informations by email at the same time.
5. We will help to track your goods until you receive them safely.