Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Hydraulic pile driver working principle and engineering application scope High frequency hydraulic vibratory pile driver is using vibrating pile sinking to drive or extract piles. It is especially suitable for municipal, bridges,cofferdam, building foundation etc. such short pile projects. Pile Driver Application The efficient of vibration pile method is higher than other methods. It is mainly are fit for driving and extracting sheet piles, I-steel piles, Cement square pile,cylinder pile, larsen piles in various shapes. This pile driving method is the most suitable for working in sand and poorer effect in the clay which must select higher power model machines. |
1. Perfectly designed for approximately 20-ton excavators.
2. Comes with a reliable Parker motor and premium brand bearing.
3. Delivers steady and powerful vibrations up to 360KN, achieving a piling speed of 7.5m/min.
4. Boasts a robust and resilient main clamp crafted through casting.
The S350 strikes an optimal balance in size, flexibility, and efficiency, making it the prime choice for diverse construction projects.
Model | Unit | S350 | S500 | S600 | S650 | S800 |
Vibration Frequency | Rpm | 3000 | 2800 | 2800 | 2700 | 2400 |
Eccentricity Moment Torque | N.M | 36 | 52 | 70 | 83.5 | 126 |
Rated excitation force | KN | 360 | 450 | 600 | 650 | 800 |
Hydraulic system pressure | Mpa | 32 | 32 | 32 | 32 | 32 |
Hydraulic system flow rating | Lpm | 250 | 240 | 315 | 310 | 310 |
Maximum pile length (m) | m | 6-9 | 6-15 | 6-18 | 6-18 | 6-22 |
The auxiliary arm weight | Kg | 800 | 800 | 900 | 900 | 1000 |
Total Weight | Kg | 1750 | 2750 | 3200 | 3200 | 3600 |
Suitable Excavator | ton | 18-25 | 27-37 | 36-50 | 42-50 | 50-70 |
To ensure the utmost safety of your goods, we offer professional, eco-friendly, convenient, and efficient packaging services.
Packaging details: Export wooden box packaging or customized as per customer requirements.
Delivery Details: Shipping is completed within approximately 20-30 working days after payment.
We rigorously test each product before delivery to guarantee every machine meets our high standards. This is a commitment we uphold for our customers. Following this, we carefully load the goods onto container trucks for transportation to the port.
Our product is compatible with various excavator brands, and we have cultivated long-term, stable partnerships with several renowned brands.
Pile Hammer How to Work?
The vibrating pile hammer employs high-frequency vibrations to accelerate the pile body, transferring vertical vibrations to the pile. This process alters the soil structure around the pile, reducing its strength. The surrounding soil becomes liquefied, decreasing the frictional resistance between the pile and the soil. Using the excavator's downforce, combined with the vibrating pile hammer and the weight of the pile itself, the pile is driven into the soil. For pile extraction, vibration is applied to pull out the pile using the excavator's lifting force. The excitation force needed for pile driving machinery is determined by site soil, soil condition, moisture content, type of pile, and construction requirements.
1. Q:How to chose the suitable model?
A: Please kindly advise your excavator weight or model, then we will help you to decide the suitable model.
2. Q: Is your vibro driver dangerous for work?
A: Our machine operate contact-free and there is no impact force on the drill rod, so our machine is not dangerous for work.
3. Q:Is your size can be custome made?
A:Yes, we can custom made according to your requests.
4. Q:Do you offer after-sale service?
A: Yes, we will offer you machine operation instructions. 6 months of warranty time for the motor will be offered to our customer dating from the receipt day. Besides, we will offer life long technical instruction.
5.Q:How To Order:
1. Please tell us the model with quantity and other requirement which you needed.
2. We issue the Proforma Invoice to you after confirmed the price and other details.
3. We arrange the order production upon receipt of confirmed PI and your deposit or original L/C.
4. After the goods is ready to ship, we will inform you the shipment date and other informations by email at the same time.
5. We will help to track your goods until you receive them safely.