Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions

Product Details
Customization: Available
After-sales Service: 1 Year
Warranty: 1 Year
Still deciding? Get samples of US$ 16500/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Industry-leading Audited Factory

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
OEM Services
The supplier provides OEM services for popular brands
R&D Capabilities
The supplier has 10 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (28)
  • Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
  • Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
  • Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
  • Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
  • Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
  • Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Certifications
  • Packaging & Shipping
  • Our Advantages
  • FAQ
Overview

Basic Info.

Model NO.
GF500
Type
Vibratory Pile Hammer
Pressure Pile Driver Type
Hydraulic Pile Driver
Pile Hammer Type
Hydraulic Hammer
Power Source
Gasoline
Motor Power
Excavator
Noise
Without Noise
Certification
EPA, CS, CE, RoHS, ISO 9001:2000, ISO 9001:2008
Condition
New
Vibration Frequency
2800rpm
Eccentricity Moment Torque
52n.M
Rated Excitation Force
450kN
Hydraulic System Pressure
35MPa
Hydraulic System Flow Rating
270lpm
Maximum Pile Length
6-9 M
Suitable Excavator
30-38ton
Transport Package
Wooden Box
Trademark
JUXIANG
Origin
Yantai China
HS Code
8430100000
Production Capacity
500set

Product Description

Product Description

1. Patented Heat Dissipation Design
Equipped with the prestigious patent number CN 219037703 U, this innovative design provides unmatched dependability for prolonged, demanding operations. It effectively reduces the risks associated with high temperatures, ensuring safety and performance.

2. Industry-Leading Machining Excellence
Crafted with precision, each component is produced using Yasida's advanced constant temperature technology. Assembled in meticulously controlled environments, our product sets a pioneering standard in technological advancement and innovation.

3. Robust One-Piece Casting Jaw
Designed for exceptional durability and enhanced longevity, this robust jaw easily withstands a wide range of challenging working conditions, showcasing top-notch engineering.

4. Strategic Alliances with OEMs, Dominating the Industry Since 2008

 

Detailed Photos

Hydraulic pile driver working principle and engineering application scope 

High frequency hydraulic vibratory pile driver is using vibrating pile sinking to drive or extract piles. It is especially suitable for municipal, bridges,cofferdam, building foundation etc. such short pile projects.

Pile Driver Application

The efficient of vibration pile method is higher than other methods. It is mainly are fit for driving and extracting sheet piles, I-steel piles, Cement square pile,cylinder pile, larsen piles in various shapes. This pile driving method is the most suitable for working in sand and poorer effect in the clay which must select higher power model machines.

Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions

Excavator Use: Juxiang GF500 Pile Vibro Hammer

Juxiang's superior excavator attachments are the top choice across various sectors, including general construction, road building and maintenance, landscaping, structural demolition, and waste management. They are also crucial in emergency rescue operations during natural calamities such as earthquakes, mudslides, and floods.

 

Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions

Product Parameters

Model GF350 GF500
Vibration Frequency (Rpm) 3000 2800
Eccentricity Moment Torque (N.m) 36 52
Exciting Force (kN) 360 450
Main Machine Weight (Kg) 2100 2750
Hydraulic System Pressure (Mpa) 32 35
Flow Demand of Hydraulic System (Lpm) 247 270
Suitable Excavator (t) 20-28 30-38

Certifications

Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions

Packaging & Shipping

Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions

Ensuring the utmost safety of your goods is our priority. We offer premium, professional, eco-friendly, and efficient packaging services to guarantee secure transport.
Packaging Details: Our adaptable export-standard wooden box packaging can be customized to fit specific customer requirements, ensuring secure and tailored protection.
Delivery Details: We assure prompt shipment, executed within an estimated 20-30 working days upon payment confirmation, ensuring timely delivery.
Prior to shipping, each machine is subjected to comprehensive testing to ensure superior quality, underscoring our unwavering commitment to excellence. Once approved, products are loaded onto container trucks for transport to the port.

Our Advantages

Our product promises seamless integration with a broad range of excavator brands. We have cultivated strong and lasting partnerships with several leading brands in the industry.

Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions
Advanced Solar Pile Installation Hammer for Efficient Renewable Energy Solutions

Pile Hammer Operation Guide

Our advanced vibrating pile hammer uses high-frequency vibrations to energize the pile body with significant acceleration. This transmits vertical mechanical vibrations to the pile, modifying the soil structure and reducing its strength. As the soil becomes more pliable, frictional resistance on the pile's sides diminishes. The combination of the excavator's downforce, the vibrating pile hammer, and the weight of the pile ensures effective soil penetration. For extraction, the vibrational force, combined with the excavator's lift force, facilitates easy pile removal. The requisite excitation force for pile driving is meticulously calculated based on local soil conditions, moisture content, pile type, and specific construction requirements.

FAQ

1. Q:How to chose the suitable model?
A: Please kindly advise your excavator weight or model, then we will help you to decide the suitable model.

2. Q: Is your vibro driver dangerous for work?
A: Our machine operate contact-free and there is no impact force on the drill rod, so our machine is not dangerous for work.

3. Q:Is your size can be custome made?
A:Yes, we can custom made according to your requests.

4. Q:Do you offer after-sale service?
A: Yes, we will offer you machine operation instructions. 6 months of warranty time for the motor will be offered to our customer dating from the receipt day. Besides, we will offer life long technical instruction.

5.Q:How To Order:
1. Please tell us the model with quantity and other requirement which you needed.
2. We issue the Proforma Invoice to you after confirmed the price and other details.
3. We arrange the order production upon receipt of confirmed PI and your deposit or original L/C.
4. After the goods is ready to ship, we will inform you the shipment date and other informations by email at the same time.
5. We will help to track your goods until you receive them safely.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier